Meeting Date
2023-12-12
Board
Present
Chris Smith, Jeff Rackliff, Laura Church, Barry Emery
  1. Reviewed and dispersed the mail.
  2. The selectmen read and accepted the minutes from the previous meeting.
  3. The Selectboard opened bids for installation of a heat pump and bids for the electrical.
    One bid was received for Electrical:
    -Hamlin Electric $620.00
    Two bids were received for the Heat Pump:
    -Webster Plumbing & Heat $12,500.00
    -Fitch Heating $7,719.63
    The Electrical bid was awarded to Hamlin Electric for $620.00. 
    The Heat Pump Bid was awarded to Fitch Heating $7,719.63.
  4.  Meeting adjourned