Meeting Date
2023-12-12
Board
Present
Chris Smith, Jeff Rackliff, Laura Church, Barry Emery
- Reviewed and dispersed the mail.
- The selectmen read and accepted the minutes from the previous meeting.
- The Selectboard opened bids for installation of a heat pump and bids for the electrical.
One bid was received for Electrical:
-Hamlin Electric $620.00
Two bids were received for the Heat Pump:
-Webster Plumbing & Heat $12,500.00
-Fitch Heating $7,719.63
The Electrical bid was awarded to Hamlin Electric for $620.00.
The Heat Pump Bid was awarded to Fitch Heating $7,719.63. - Meeting adjourned